Our Projects

  • Formation of new road from Rayachoty-Vempalli road to IIIT West campus road from Km.0/0 to 8/820. Sub work Formation of 4 lane road from Km.4/200 to 8/820 in Kadapa Distrct, Andhra Pradesh.
  • Formation of 4 lane road from Km.46/0 to 53/0 of Rayachoti -Vempalliroad (Via.,) Gandi to Vempalli (Working reach from Km.47/0 to 53/9) in Kadapa District, Andhra Pradesh.
  • This project has been awarded by to our own Project and involves the following: Internal Road Works at Construction of Research Building Complex and Providing Infrastructure Facilities for IGCARL (phase 2) at Pulivendula, Kadapa District.

  • Chittoor (R&B) Cicle – (R&B) Division, Madanapalli – Improvements to Vayalpadu – Gurramkonda Galiveedu Road from Km. 0/0 to 16/6 in Chittoor District, Andhra Pradesh.

  • Output and Performance Based Road Contract for the Maintenance of Package-20 Roads in Kadapa District of Andhra Pradesh.
  • Improvement to Mallela-Lavanur road from Km. 0/0 to 21/6 in Kadapa District, Andhra Pradesh.
  • Design, Construction for improvement, upgrading to two lane carriageway, Finance, Operation and Maintenance of Pulivendula – Parnapalli Road from km. 4/0 to 20/0 & 27/0 to 31/5 in Kadapa District in AP under BOT Annuity.
  • Design, Construction for improvement, upgrading to two lane carriageway, Finance, Operation and Maintenance of Rayalapuram-Gundluru from km 12/0 to 28/0 in Kadapa District in AP under BOT Annuity.
  • Design, Construction for Improvement, Up Grading to Four Lane Carriageway, Finance, Operation and Maintenance of Kadapa-Pulivendula Road (KP-04) from Km. 46/200 to 67/600 in Kadapa District on Build, Operate and Transfer (BOT) Annuity. Project Cost Rs. 71.21 Crores.
  • Design, Construction for Improvement, Up Grading to Four Lane Carriageway, Finance, Operation and Maintenance of Kadapa-Pulivendula Road (KP-01) from Km. 1/700 to 15/000 in Kadapa District on Build, Operate and Transfer (BOT) Annuity. Project Cost Rs. 60.35 Crores.
  • Design, Construction for Improvement, Up Grading to Four Lane Carriageway, Finance, Operation and Maintenance of Kadapa – Pulivendula Road (KP-02) from Km. 15/000 to 28/000 in Kadapa District on Build, Operate and Transfer (BOT) Annuity. Project Cost Rs. 51.95 Crores.
  • This project has been EPC Contract (Concessionaire/Owner M/s. BVSR HARDA BETUL ROAD PROJECTS PVT. LTD.) by to our EPC Project and involves the following: Government of Madhya Pradesh has constructed MPRDC with Construction of Two Major District Roads under Package-VII comprising of Harda – Chhipaner (29.30 Km.) & Betul – Atner (34.50 Km.) (Total Length – 63.8 Kms.) of MDR on DBFOT Annuity Basis. Project Cost Rs. 82.12 Crores.
  • This Project has been EPC Contract (Concessionaire/Owner M/s. BVSR SSG ROAD PROJECTS PVT. LTD.) Development of Sausar – Mahgaon – Mordongri, Sonapiparti – Umreth – Monari – Umbah & Gadarwara – Tendukheda (MDRs) Total Length of road is 86.11 kms. under (Package – V) BOT Annuity Basis in the State of Madhya Pradesh Total Project Cost Rs. 145.61 Crores.
  • Rehabilitation and Upgradation of NH – 42 (old NH-205) from Km. 134/000 (old chainage Km. 58/0) to Km. 202/050 (old chainage Km. 126/0) (Mudigubba to Anantapuram Dist. Border section) to two lane with paved shoulders in the State of Andhra Pradesh under Corridor Approach plan on Engineering, Procurement & Construction (EPC) Basis Contract (Aggregate Length of 67.920 Km). Project Cost Rs. 176.29 Crores.
  • Widening and Strengthening from Km 513/0 to 546/550 (Design Chainage Km 513/0 to 00Km 545/150) of Muddanur to Jammalamadugu Section of NH 67 to 2 lane with paved shoulder including 4 laning in 3.05 Km (542/100 – 545/150) in Jammalamadugu town section in the State of Andhra Pradesh under Corridor approach (aggregate length of 32.150 Km) under EPC mode of Contract. Project Cost Rs. 99.96 Crores.
  • Widening and Strengthening from Km 513/0 to 546/550 (Design Chainage Km 513/0 to 00Km 545/150) of Muddanur to Jammalamadugu Section of NH 67 to 2 lane with paved shoulder including 4 laning in 3.05 Km (542/100 – 545/150) in Jammalamadugu town section in the State of Andhra Pradesh under Corridor approach (aggregate length of 32.150 Km) under EPC mode of Contract. Project Cost Rs. 99.96 Crores.
  • Rehabilitation & Upgradation from km 18/350 to km 56/0 on Chittoor – Kurnool road of NH – 18 (New NH – 40) to two lane with paved shoulders in the State of Andhra Pradesh (Under EPC Mode) Project Cost: 112.93 Crores.
  • Earthwork in formation (cutting & filling), Moorum Blanketing, construction of New culverts, extension of existing culverts, Fencing, Retaining Wall, Pathways, Drains in connection with the construction of Private Railway siding for the proposed 3.0 MTPA Integrated Steel Plant of NMDC Ltd. At Nagarnar Near Jagadalpur in the State of Chhattisgarh Package -2 Project Cost Rs. 37.32 Crores.
  • Two Laning with hard shoulder of Donganagarh – Chichola Road section from km 0.000 to km 15.356 in the State of Chhattisgarh on EPC mode (Project Cost: 39.30 Crores).
  • Two Laning with hard shoulder of Durg – Dhamdha – Bemetara Road section from existing chainage km 0.000 to km 33.148 in the state of Chharrisgarh on EPC Mode (Project Cost: 73.39 Crores).
  • Construction of Bypass to Vizianagaram Town of NH-43 (New NH-26) from Km 537/6 to Km.552.000 (Raipur to Vishakhapatnam Section) to 4 Lane in the State of Andhra Pradesh on EPC (Project Cost: 264.52 Crores.)
  • Rehabilitation and upgradation of NH-43 (old NH-78) from (Old Ch. 245.000 to 331.000 km, New Ch. 245.000 to 323.100 km) (MP border/ CG border to Surajpur section) to two lane with paved shoulders in the State of Chhattisgarh under Corridor Approach through EPC mode. (Project Cost: 234.25 Crores.)